
Digital Engineering, BIM Modelling, VDC & Coordination
Resolve coordination risk before you break ground. ISO 19650 aligned. Battle-tested on Tier 1 projects.
We resolve coordination risk before you break ground. High-standard Virtual Design & Construction (VDC) modelling, ISO 19650 aligned BIM coordination and clash-free federated models for large, complex programmes. We construct projects in a virtual environment first, surface the issues that quietly burn programme and margin, and engineer them out early. For volume builders moving from CAD, we deliver complete BIM standards, tailored templates, sample projects and embedded training that compress adoption from years to weeks.
What this looks like in practice
A snapshot of real outputs across recent engagements.
01Multi-discipline federated BIM coordination model
02BIM management & project coordination across design phases
03Clash detection & construction coordination workflows
04Point cloud scanning & review against as-built models
054D construction sequencing & site logistics modelling
06Complex facility MEP coordination & routing
07BIM content creation & digital asset standards
08BIM training, change management & team upskilling
Detailed capabilities
Every capability is built on real project experience: refined across dozens of engagements and ready to deploy on yours.
BIM Management (Full Lifecycle)
End-to-end BIM management from early project phases through design and construction to as-built deliverables: ensuring model quality, data integrity, and standard compliance at every stage.
Construction Coordination & Clash Detection
Multi-stakeholder clash detection and resolution across structural, mechanical, electrical, hydraulic, and fire disciplines on Tier 1 projects using Navisworks, Revizto, and Solibri.
ISO 19650 BIM Execution Planning
Strategic BIM execution plans (BEP), information delivery plans, master information delivery plans, and complete standards creation aligned with ISO 19650 international best practice.
BIM Peer Reviews & Project Auditing
Independent BIM peer reviews and comprehensive project auditing: identifying gaps, inconsistencies, and improvement opportunities in model quality and data compliance.
BIM Content Creation (Revit Families)
High-quality parametric Revit family creation, file format conversion, and BIM content libraries: building components that are data-rich, lightweight, and specification-ready.
Project Establishment & Templates
BIM project establishment, master coordinates model creation, shared coordinate setup, and Revit project template development tailored to your organisational standards.
Common Data Environment (CDE)
Autodesk Construction Cloud, BIM 360, and Revizto Next configuration: model federation, folder structures, permission management, automated auditing, and workflow setup.
Point Cloud Scanning & As-Built
Point cloud scanning review, scan-to-BIM modelling, and as-built documentation: verifying constructed conditions against design models for accurate facility records.
Revit Modelling (All Disciplines)
Professional Revit modelling for architecture, building services (MEP), and structural disciplines: LOD 100 through LOD 500 with full documentation and drafting support.
CAD-to-BIM Migration
Complete migration programmes for volume builders: tailored Revit templates, sample projects, family libraries, naming conventions, and intensive team training in weeks, not years.
Site Logistics & 4D Sequencing
4D construction sequencing, site logistics modelling, crane reach analysis, and phased construction planning to de-risk complex construction programmes.
BIM Training & Change Management
Practical adoption strategies: embedded training programmes, standard operating procedures, competency frameworks, and ongoing mentoring that gets teams productive fast.
Typical deliverables
How we engage
Flexible engagement models designed to fit your project needs, team structure, and budget.
Project-based
Fixed scope for defined BIM deliverables: coordination packages, execution plans, or migration programmes.
On-Demand
Flexible resource augmentation for ongoing BIM management, modelling, and coordination support across your project portfolio.
Embedded Team
Dedicated BIM professionals embedded in your project team: working to your standards, within your CDE, as an extension of your team.
Tools & Technologies
Related case studies
All projectsRelated insights
All in BIM & Digital Engineering
BIM & Digital EngineeringWhat is BIM and Why Does It Matter in 2026?
Read
BIM & Digital EngineeringThe BIM Lifecycle: From Project Setup to Operations
Read
BIM & Digital EngineeringFrom CAD to BIM: A Migration Playbook for Volume Builders
Read
BIM & Digital EngineeringClash Detection and Model Coordination: Best Practices
ReadExplore other service pillars
Ready to build your delivery system?
Every system we build starts with a single conversation. Let's explore what's possible for your team.



